Sector: IPP
Location: Jodhpur
Start Date: 01-09-2019
Voltage Class: 220/33 kV, 130 MW
Hartek Power was awarded a complete turnkey EPC contract of 220/33 kV Switchyard connecting 130 MW of solar to the Grid. The scope involved both civil and electrical packages of the substation including GSS Hybrid bay. It also builds a GSS Hybrid Bay for 1 x 130 MW Solar Power Project.