This project involves the design, supply, erection, and testing of a 220kV switchyard, including the installation of 220kV GIS (2 incomers, 3 outgoing, 1 buscoupler, and 2 Bus PTs) and 33kV GIS (3 incomers, 11 outgoing, 2 buscouplers, 4 bus sectionalizers, and 4 Bus PTs). Additionally, the project includes the installation of a 220/33kV, 3x80/100 MVA transformer. This comprehensive scope ensures the efficient operation and integration of high-voltage equipment, enhancing the power distribution network's reliability and capacity.